Flooring Linoleum : Subfloor Work

Flooring Linoleum : Subfloor Work

Updated : June 2013




How to Begin Site Prep Work For Linoleum?

That depends upon the nature and age of the subfloor. Always consult with your installer first. If adjacent floorboards are at different heights, sanding may be required. If they have serious flaws, a self-leveling cementitious product or a premade 1/8"-1/2" hardboard or cement board may suffice. If the concrete slab is cracked, a filler needs to be used in conjunction with an isolation membrane. If the floor is damp it needs to dried thoroughly. If mildew or mold exists they need to be removed. If the floor is squeeky or weak, structural work may be required or hardboard or cement board may suffice.